Adaptació d’una instal·lació solar fotovoltaica per a la cobertura de talls del subministrament elèctric en una escola d’Etiòpia
dc.contributor
dc.contributor.author
dc.contributor.other
dc.date.accessioned
2022-06-23T09:14:06Z
dc.date.available
2022-06-23T09:14:06Z
dc.date.issued
2020-06-01
dc.identifier.uri
dc.description.abstract
Aquest Treball Final de Màster (TFM) està vinculat al Projecte de Cooperació promogut pel
Departament de Física de l’Escola Politècnica Superior de la UdG i cofinançat per l’Oficina de
Cooperació de la UdG, el qual ha volgut treballar conjuntament amb l’escola d’Abay Mado
situada a la ciutat de Bahir Dar, Etiòpia. A la Figura 2 es mostra el seu emplaçament.
El treball neix després d’haver participat a la primera fase del projecte al gener del 2020, en
la qual es va fer el muntatge d’una instal·lació fotovoltaica i es va poder conèixer de primera
mà l’escola i les persones que hi treballen. El present projecte proposa una segona fase, en
la que es fa l’estudi d’una solució als talls de subministrament elèctric que pateix l’escola.
Aquest es fa partint del sistema fotovoltaic instal·lat i la informació que aquest aporta.
Amb el projecte es pretén estudiar la viabilitat i donar una resposta tecnològica a un problema
comú com és els talls de subministrament elèctric provinent de la xarxa pública. Com la
majoria de sistemes fotovoltaics d’aquest tipus, el sistema ja instal·lat a l’escola deixa de
subministrar energia quan hi ha un tall de llum. Mitjançant l’estudi energètic de l’escola, es vol
dissenyar una solució a mida per tal que es puguin suplir els talls d’electricitat a través d’un
sistema d’emmagatzematge amb bateries
This Final Master's Thesis (TFM) is linked to the Cooperation Project promoted by the
Department of Physics of the Polytechnic School of the UdG and co-financed by the
Cooperation of the UdG, which has wanted to work together with the school of Abay Mado
located in the city of Bahir Dar, Ethiopia. Figure 2 shows its location.
The work was born after participating in the first phase of the project in January 2020, in
which was assembled in a photovoltaic installation and was first known
but the school and the people who work there. The present project proposes a second phase, in
the study of a solution to the power cuts suffered by the school.
This is done based on the installed photovoltaic system and the information it provides.
The aim of the project is to study the feasibility and provide a technological answer to a problem
common as is the power outages from the public grid. Like the
most photovoltaic systems of this type, the system already installed in the school stops
supply power when there is a power outage. Through the energy study of the school, it is wanted
design a bespoke solution so that power outages can be met through one
battery storage system
dc.format.mimetype
application/zip
dc.language.iso
cat
dc.relation.ispartofseries
Màster en Enginyeria Industrial
dc.rights
Attribution-NonCommercial-NoDerivatives 4.0 International
dc.rights.uri
dc.subject
dc.title
Adaptació d’una instal·lació solar fotovoltaica per a la cobertura de talls del subministrament elèctric en una escola d’Etiòpia
dc.type
info:eu-repo/semantics/masterThesis
dc.rights.accessRights
info:eu-repo/semantics/openAccess
dc.audience.educationlevel
Estudis de postgrau (màsters oficials i doctorats)
dc.coverage.geolocation
east=2.8319419984503247; north=42.2651828700704; name=
Localització